The IIAR Guideline for Installing Insulation on
Ammonia Refrigeration Systems was developed to enhance the safety, reliability,
effectiveness, and longevity of insulated piping, vessels, and other equipment.
It provides detailed instructions for installing insulation systems, provides
examples of poorly installed or maintained insulation systems, and provides
quality assurance guidance to help owners and contractors achieve a high level
of quality for installed insulation systems. This guideline focuses on the
appropriate steps in installing insulation systems for cold piping and
equipment on new and existing ammonia refrigeration systems. Additional
precautions for working on or around charged ammonia refrigeration systems are
necessary but are not addressed within the scope of this guideline. This
guideline was developed as the result of an Ammonia Refrigeration Foundation
research project. Its scope is limited to the application of polyisocyanurate
(PIR) and extruded polystyrene (XPS) because most refrigeration applications
use these two types of insulation.